Awaab's Law Phase 2 comes into force on 30th November 2026, introducing new requirements for social housing landlords across England. Expanding beyond damp and mould, the legislation will bring additional health and safety hazards into scope, including fire safety, electrical hazards, structural risks and temperature-related concerns.
With the implementation date approaching, housing providers must review their existing compliance arrangements, understand the expanded requirements and ensure they have the resources and processes in place to respond within the statutory timeframes for each hazard.
What Is Awaab's Law?
Awaab's Law was introduced following the tragic death of two-year-old Awaab Ishak in 2020, who died after prolonged exposure to mould in his family's social housing property.
The legislation places specific legal obligations on social housing landlords to investigate and address certain health and safety hazards within prescribed timescales.
Phase 1 came into force on 27 October 2025, introducing requirements for significant damp and mould hazards and all emergency hazards, excluding overcrowding.
Phase 2, which takes effect on 30th November 2026, significantly expands the range of significant hazards covered by these requirements.
The legislation is being introduced in stages, with a further expansion to remaining Housing Health and Safety Rating System (HHSRS) hazards, excluding overcrowding, planned for 2027.

What Does Awaab's Law Phase 2 Introduce?
From 30th November 2026, social housing landlords must comply with Awaab's Law requirements for a broader range of significant hazards.
The additional categories include:
Fire and Explosion Hazards
Fire safety risks within individual homes will fall within the expanded requirements. This could include defective or missing smoke alarms and other fire hazards that present a significant risk to residents.
Importantly, Awaab's Law does not duplicate existing fire safety legislation governing communal areas and other parts of buildings covered by the Regulatory Reform (Fire Safety) Order 2005.
Housing providers must therefore understand which legislation applies to different areas of their buildings and ensure appropriate arrangements are in place to identify and address fire safety deficiencies.
Electrical Hazards
Electrical safety is another important addition to Phase 2, covering significant risks associated with electrical installations and equipment within social housing properties.
Examples could include exposed wiring, unsafe electrical installations, damaged sockets and other electrical defects that present a significant risk of injury.
Housing providers should ensure electrical inspections, maintenance programmes and remedial works are effectively coordinated, particularly where urgent safety concerns are identified.
Structural Collapse and Falling Elements
Phase 2 introduces significant hazards associated with structural collapse and falling building elements.
These could include deteriorating structural components, unstable building elements or other defects that create a significant risk of injury to residents.
Housing associations may need to commission specialist building surveys or structural assessments to establish the severity of identified defects and determine appropriate remedial measures.
Excess Cold and Excess Heat
Temperature-related hazards will also fall within the expanded requirements.
Excess cold can arise from inadequate heating, poor insulation or building defects, while excess heat may be associated with overheating, inadequate ventilation or other property-related issues.
Housing providers should review how these concerns are identified and managed, particularly where vulnerable residents may be disproportionately affected.
Falls and Domestic Hygiene
Phase 2 also extends to significant hazards involving falls, including falls on level surfaces, stairs and between levels.
Domestic hygiene hazards, including personal hygiene and food safety, will also be covered. These may arise from defective sanitary facilities, drainage problems or other conditions affecting the safe use of a property.
The inclusion of these hazards reinforces the importance of a comprehensive approach to property condition, maintenance and resident safety.
What Are the Compliance Timescales Under Awaab's Law?
The expanded scope of Phase 2 does not simply introduce additional hazards. It also requires housing providers to apply strict investigation, communication and remediation processes to a wider range of reported issues.
The key statutory timescales are:
| Requirement | Timescale |
| Investigate potential emergency hazards and complete relevant safety work | Within 24 hours of becoming aware |
| Investigate potential significant hazards | Within 10 working days |
| Provide a written summary of investigation findings, where required | Within 3 working days of the investigation concluding |
| Complete relevant safety work for significant hazards | Within 5 working days of the investigation concluding |
| Begin or take steps to begin preventative works | Within 5 working days of the investigation concluding |
| Begin preventative works where starting within 5 working days is not reasonably practicable | As soon as reasonably practicable, and within 12 weeks |
These timescales should be treated as maximum periods rather than targets. Where a hazard presents an immediate or particularly serious risk, landlords should respond sooner.
It is also important to distinguish between making a property safe and completing the permanent works necessary to prevent a hazard from recurring.
For example, temporary measures may be appropriate to remove an immediate risk while more extensive remedial works are arranged. However, temporary repairs do not remove the obligation to address underlying defects where further work is required.
Where relevant safety work cannot be completed within the required timeframe, landlords may also be required to secure suitable alternative accommodation for affected residents.
.jpg?width=6240&height=4160&name=Greystar%20-%20Sheffield%203%20-%20Sheffield%20(49).jpg)
How Can Housing Associations Prepare for Awaab's Law Phase 2?
With the 30th November deadline fast approaching, housing associations and local authorities should be reviewing their existing arrangements to ensure they can identify, investigate and address the additional hazards covered by the legislation.
1. Review Existing Building Safety and Compliance Data
Housing providers should begin by reviewing their existing property condition information, including fire risk assessments, electrical inspection reports, stock condition surveys and outstanding remedial works.
This information can help identify properties where known defects may fall within the expanded scope of Awaab's Law.
Particular attention should be given to outstanding high-risk defects, recurring maintenance issues and properties where previous surveys have identified concerns that have not yet been fully resolved.
Existing information should be used to support risk-based prioritisation, rather than relying solely on residents reporting problems.
2. Identify Gaps in Inspection and Survey Programmes
The expansion of Awaab's Law may expose gaps in existing property inspection arrangements.
Housing providers should consider whether their current survey programmes provide sufficient information to identify potential fire, electrical, structural and other significant hazards.
Where information is incomplete or outdated, additional surveys or specialist inspections may be necessary.
For example, a housing association may have an established programme of fire risk assessments but limited information about structural defects or electrical hazards within individual dwellings.
A coordinated approach to building surveys can help organisations understand their risks and prioritise further investigations.
3. Review Hazard Reporting and Escalation Procedures
Housing associations must ensure that reported hazards are correctly identified, assessed and escalated within the required timeframes. This includes reviewing how resident concerns are received, how potential emergency and significant hazards are classified, and how cases are passed to relevant technical teams or contractors.
Staff responsible for resident communications, repairs, maintenance and compliance should understand the expanded hazard categories and know when specialist advice is required.
Organisations should also consider how they record decisions, monitor statutory deadlines and demonstrate that appropriate action has been taken.
4. Ensure Contractors Can Meet Statutory Response Times
One of the most important considerations for housing providers will be their ability to mobilise competent contractors quickly enough to meet the requirements. The expansion into fire safety, electrical hazards and structural risks means housing associations may need access to a wider range of specialist expertise, often at short notice.
Existing contractor arrangements should be reviewed to establish whether they provide sufficient capacity, geographical coverage and technical competence. Where multiple contractors are responsible for different compliance disciplines, clear escalation procedures and defined responsibilities will be essential.
This highlights the benefits of working with a single compliance partner such as Ventro, which can provide expertise across multiple compliance disciplines, helping housing providers streamline contractor management, improve coordination and respond more efficiently to identified hazards within the required timescales.
5. Develop a Coordinated Approach to Remedial Works
Identifying a hazard is only the first stage of compliance. Housing providers must also ensure that necessary works are completed within the relevant statutory timescales.
This may involve immediate safety measures, specialist investigations and more extensive permanent remediation.
For example, an electrical inspection may identify an unsafe installation requiring urgent isolation and subsequent replacement. Similarly, a structural assessment may identify a defect requiring temporary safety measures before permanent repairs can be completed.
Housing associations should ensure their survey, maintenance and remedial works programmes are effectively connected, reducing delays between identifying a defect and resolving it.
6. Strengthen Resident Communication and Record Keeping
Awaab's Law places considerable emphasis on keeping residents informed. Housing providers must ensure residents receive required written investigation summaries and are kept updated on the progress and expected timescales of remedial works.
Clear records of reported hazards, inspection findings, contractor attendance, access attempts and completed works will be important in demonstrating compliance.
Resident circumstances must also be considered when assessing hazards. A condition that presents a significant risk to one household may require a different response for another, particularly where children, older residents or individuals with additional health needs are involved.
Why a Proactive Approach to Building Compliance Matters
The introduction of Phase 2 reinforces the importance of moving beyond reactive maintenance towards a more coordinated approach to building safety.
For housing associations managing large property portfolios, identifying and resolving hazards can involve several different teams, contractors and specialist disciplines. Without effective coordination, delays can arise between the initial report, technical investigation and completion of remedial works.
Taking a proactive approach to surveys, risk identification and planned maintenance can help housing providers reduce the likelihood of hazards escalating, improve resident safety and support more efficient management of their compliance obligations.
It can also help organisations prepare for the further expansion of Awaab's Law planned for 2027.
.jpg?width=785&height=589&name=Firntec%20-%20Monks%20Croft%20-%20Compartmentation%20Survey%20(8).jpg)
How Can Ventro Support Housing Providers with Awaab's Law Phase 2?
Ventro Group supports housing associations and local authorities across the UK with specialist building compliance services, helping organisations identify, assess and address building safety risks.
Through our integrated service offering, we can support housing providers with several of the technical requirements associated with Awaab's Law Phase 2.
Fire Safety Surveys and Assessments
Our fire safety specialists can undertake fire risk assessments and other relevant inspections to help housing providers identify fire safety deficiencies and understand the actions required to address them.
Electrical Inspections and Remedial Works
Ventro provides electrical inspection, testing and remedial services, supporting housing providers in identifying unsafe installations and completing necessary electrical safety improvements.
Building and Structural Assessments
Through our sister company, Firntec, we can provide specialist building surveying and consultancy services to help clients investigate building defects, understand structural concerns and establish appropriate remediation strategies.
Fire Safety and Building Remediation
Where surveys identify defects, Ventro can also deliver a range of remedial works, including passive fire protection, fire door works, electrical improvements and wider building refurbishment activities.
Nationwide Compliance Support
With nationwide coverage and expertise across multiple compliance disciplines, Ventro can help housing providers coordinate surveys, specialist investigations and remedial works through a single compliance partner.
This integrated approach can reduce the complexity of managing multiple contractors while helping housing associations respond efficiently to identified building safety risks.
Prepare for Awaab's Law Phase 2 with Ventro
With Awaab's Law Phase 2 coming into force on 30th November 2026, housing associations and local authorities should ensure their existing compliance arrangements are ready for the expanded requirements.
From reviewing existing building safety information to identifying potential hazards and completing remedial works, early preparation will be essential.
Ventro can support your organisation with specialist building surveys, fire and electrical safety services, and remedial works to help you manage building safety risks and prepare for the expanded requirements of Awaab's Law.
Contact our team today to discuss how we can support your housing portfolio.