Theatre Door Replacements for Basildon NHS

Basildon NHS 6

Industry

Healthcare

Challenge

Basildon University Hospital required high-quality fire door installations for theatres 6 & 7 during a full refurbishment. The challenge involved overcoming significant logistical hurdles due to unpredictable emergency procedures, demanding extreme flexibility and coordination within an active hospital environment.

Results

Ventro successfully delivered the fire door installations efficiently and under budget, achieving 100% compliance and a 98% first-time fix rate. This met the hospital's fire safety and operational requirements, provided enhanced fire protection and hygiene, and ensured continuous access to real-time compliance data.

Key Product

Fire Doors

1512
Site visits to date
100%
compliance rate
98%
first time fix rate
Basildon NHS

About Basildon University Hospital

Basildon University Hospital is an acute general hospital in Basildon, serving a significant population. As part of the Mid and South Essex NHS Foundation Trust, it is dedicated to providing high-quality patient care and maintaining safe, functional environments for its staff and visitors. The project involved the full refurbishment of theatres 6 & 7 within their theatre building.

The Challenge

Basildon University Hospital required a high-quality fire door installation as part of a full refurbishment of theatres 6 & 7. Working within an active hospital environment presented unique and significant logistical challenges. On several occasions, the Ventro team arrived on-site but was unable to commence work due to theatres being in use for emergency procedures. This unpredictable nature of hospital operations demanded an exceptionally high degree of flexibility and coordination with hospital staff to ensure that essential fire safety works could be completed without affecting critical patient care.

The Solution

Understanding the unpredictable nature of hospital operations, Ventro adopted a highly adaptable and collaborative approach. The team strategically scheduled works for weekends, including Saturdays, to align with lower theatre usage. This proactive planning effectively minimised disruption to vital hospital services while ensuring that critical fire safety upgrades could be delivered within the hospital’s stringent refurbishment timeline.

Basildon NHS 5Close collaboration was key: Ventro worked in tandem with SDS (the advanced fire door supplier) and the hospital facilities team to ensure clear communication and rapid response to any scheduling adjustments. For the installation, Ventro utilized SDS’s advanced fire doors, specifically designed for high-risk healthcare settings, providing superior fire protection, durability, and hygiene control.

Additionally, DSI Automation supplied and installed specialist door closers, ensuring smooth, hands-free operation in compliance with hospital safety and accessibility requirements. Ventro also provided a one-stop solution for the client, efficiently project managing between all parties, including door suppliers, closure specialists, and electricians, while prioritizing the job to ensure its completion within the hospital’s refurbishment timeframes.

The Results

Ventro's flexible, technically proficient, and collaborative approach yielded significant outcomes for Basildon University Hospital:

  • High-Quality, Compliant Installation: Ventro successfully delivered a high-quality fire door installation that not only met but exceeded the hospital’s fire safety and operational requirements. The project achieved a 100% compliance rate.

  • Operational Efficiency & Cost Savings: The project was completed efficiently and under budget, demonstrating Ventro's expertise in managing complex hospital environments.

  • Enhanced Fire Protection & Functionality: The installation of SDS’s advanced fire doors and DSI Automation’s specialist door closers significantly enhanced both fire safety and operational efficiency within the theatres, providing superior protection, durability, hygiene, and hands-free access.

  • Minimal Disruption to Patient Care: Through careful planning, weekend scheduling, and close coordination with hospital staff, Ventro successfully completed the works without affecting critical patient care, despite unpredictable emergency theatre usage.

  • Golden Thread: All project data was recorded on Ventro’s live compliance operating system, providing full transparency and real-time updates. The hospital facilities team had direct access to this system, enabling them to track progress, review compliance documentation, and access the completed Operations & Maintenance manual for future reference.

  • High Client Satisfaction: The project resulted in a 98% first-time fix rate, leaving Basildon University Hospital confident, compliant, and extremely satisfied with Ventro Group's performance.